STAGES OF REHABILITATION/MODERNIZATION OF THE SECONDARY INFRASTRUCTURE OF IRRIGATION FACILITIES IALOMIȚA CĂLMĂȚUI TERRACE, IALOMIȚA COUNTY. CASE STUDY: SPP 13 IRRIGATION PLOT BELONGING TO O.U.A.I. MURGEANCA* PUBLISHED

T.E. MAN1, A. SMULEAC2, Laura SMULEAC2, Anisoara IENCIU2, M.V. ILCA1, Loredana COPĂCEAN2,1, A. CIOCLOV3 1Politehnica University of Timisoara, 300006 Timisoara, P-ta Victoriei no. 2 2Banat’s University of Agricultural Sciences and Veterinary Medicine”King Mihai I of Romania” from Timisoara, 300645, 119, Calea Aradului, Timisoara, Romania 3SC Roxad Cioclov SRL, Calafat eugen@zavoi.ro
After 1989, irrigation facilities were increasingly less used, entering a process of physical and moral damage. The paper briefly presents the way applications for accessing the rehabilitation/modernization of the main and secondary infrastructure of irrigation facilities are done. The case study is made for an irrigation plot from the patrimony of irrigation water users (O.U.A.I.) using modern mobile watering equipment and equipping pressure pumping stations with new energy performance aggregates, start/stop safety and higher functioning yields. The Ialomița-Călmățui Terrace irrigation facilities in operation between 197and 1983, of which, in the Țăndărei area, the gross area of 7,275 ha and the net area of 7,158 ha is served by pressure pumping stations SPP 13, SPP 14, SPP 22, SPP 21+21bis, of which: 1,354 ha in plot SPP 13, 1,606 ha in plot SPP 14, 1,686 ha in plot SPP 22 and 2,512 ha in plot SPP 21+21bis. For the case study, the modernization of SPP 13, representative of the current stage, belonging to Murgeanca, the initial state, the technical solution for modernization and the current situation after the modernization investment are presented. By rehabilitation/modernization of the irrigation plot, it has also been streamlined through the economy of labour, energy and water.
Irrigation, Rehabilitation, Modernization, Pumping Station
environmental engineering
Presentation: poster

Download



Back