TOPOGRAPHICAL WORKS FOR THE EXPANSION OF WAREHOUSE LOGISTICS CENTER IN JUC-HERGHELIE, CLUJ COUNTY PUBLISHED
IsailaRazvan-George, Șmuleac Adrian NoneThe work aims to stakout a storage warehouse in village JUCU.The stakout works were done in five stages.In the first stage was made a closed circuit site network of four terminals located in the four corners of the land limit on which the investment is located.The network was determined with the total station model”Leica TS06 Plus”, two of the terminals being determined “ROMPOS” which is a Romanian position determination system that ensures precise placement in the reference systemand european coordinates ETRS89 with the help of a GPS Rover model South S82V.In the second stage were materialized the foundation pits with vat by GPS kinematic measurements, the reference being located on one of the four site network terminals.In the third stage, after pouring the concrete equalization of the foundation at elevation of -3.8m determined using optical level model “Leica NA720”,on the edge of each pit it was sationated with the total station which was determined with the “FREE STATION” program of the total station, estimated error being about 3-4 mm and were materialized the corners of the base foundation with nails.In the case of the foundation collar it was done the same as the base foundation case.In fourth stage, on the foundation it was materialized with paint the axes of the investment with “REFERENCE LINE” program of total station.Fifth stage.After mounting the poles in positions,it proceeded to verticalization of the poles with the help of two total stations which were used as simple theodolite,arranged approximately perpendicular and positioned to be in alignment with the signs marked with paint on the poles and foundation, the sign must match on the cross-hair of the instrument.The operations were done according STAS 9824/0-74(Terestrial measurements,construction stakout, general perceptions),STAS 9824/1-87(Terestrial measurments,civil,industrial and agritehnical constructions stakout),guide C83-75 (guide for the execution of detail staking of the construction).
TOTAL STATION, GPS, FREE STATION, REFERENCE LINE, ROMPOS
Presentation: poster
Back