THE USE OF MODERN TECHNOLOGIES FOR THE EXECUTION OF CIVIL AND INDUSTRIAL CONSTRUCTION WORKS PUBLISHED
Alexandru Marian Gabriel COSTINAȘ, Iosefina L. ȘMULEAC, Adrian ȘMULEAC University of Life Sciences "King Michael I" from Timisoara adrian_smuleac@usvt.roThe civil and industrial construction works, which include the topographic survey of the land and the staking of the construction elements, were carried out using modern equipment to ensure the necessary precision. In the case of the civil construction, which consists of three buildings with a basement, ground floor, and four stories, the topographic surveys were performed with the help of a Trimble R8 GNSS GPS, which allowed obtaining precise measurements due to its compatibility with several GNSS networks (GPS, GLONASS, Galileo, BeiDou). The staking of the construction elements was carried out with a robotic total station Trimble S7, ensuring efficiency and precision. For determining the elevations and performing the leveling, a Leica Sprinter 250M digital level was used.
For the industrial constructions, the topographic survey of the land was also performed with the GNSS Trimble R8 GPS, and the staking of the prefabricated elements was done with the same robotic total station Trimble S7. The Leica Sprinter 250M digital level was used for establishing the elevations. All elevations were referenced to the project's elevation 0, which is defined by a specific value, tied to the level of the Black Sea, thus providing a well- established reference point. The obtained data was processed and organized in AutoCAD for a clear and detailed representation of the works.
The coordinate system used was Stereographic 1970, and the final data processing was done in AutoCAD to ensure an accurate result.
GNSS, Trimble R8, Trimble S7, Leica Sprinter 250M, AutoCAD, civil constructions, industrial constructions, Stereografic 1970
geodesy engineering
Presentation: poster